PUBLIC_INTEL_FILE_#509 LOGGED: 2024-06-21 21:53:02

Into the Bush - Act 3 - Pre-Op Intel for 21Ju

Campaign Into the Bush
Author @rolandgrimes
// ATTACHED_VISUAL_INTEL
// DECLASSIFIED_RECORD_CONTENT
After the attack on the warehouse on Tuesday, Aztec began to pickup faint radio transmissions at several locations in the southern regions of the area. Combined with the radio issues that began to appear between Platoon and Company Command, Norse will be setting up a series of communications towers to stabilize our radio network in the southern region. Additionally, Aztec Actual has informed us that by doing this, we will also be able to determine the location of radio signals near our current HQ/FOB, which will allow us to track down/assault more "potentially aggressive" individuals.

Mission Intel

There are multiple radio signals being received in the southern regions of the AO. Currently no information is known about what these signals are, or their precise location.

Mission Objectives

Travelling by helo, Norse will:

- Establish a small network of communications towers (3 in total)
- Work with Aztec to begin tracking enemy signals
- Conduct recon/assault discovered objectives as able

Deployment Conditions
Est. Deployment time is 1100
Weather forecast is rain, transitioning to clear.
If you read this, react with sun.
PRAETORIAN DEFENSE SOLUTIONS // PUBLIC REPOSITORY INTEL_ID: 509